Projects

May 15, 2019

This project is on Arbor Way and is well under construction, as the photographs show.  The home is a two-bedroom, with an extended window in one of the upper bedrooms, as well as a large deck.  We expect this project to be delivered late spring of 2015.


May 15, 2019

This project, on Thumpertown Road, is in the plan approval stage. The property’s existing cottage will be torn down and removed, to be replaced by two-story dwelling with three bedrooms.  Delivery is expected to be mid-summer of 2015.


May 15, 2019

This is an addition to a summer cottage that has been winterized.  The addition was framed, and sealed by a rubber compound new to construction methods.  The rubber compound helps secure the framed addition to wind-tight condition, and is an alternative to sprayed insulation.  Although an extra step, it is actually a cost-effective construction method that will serve the homeowners well.  The photos depict the rubber sealant, as well as the point of connection between the addition and the existing dwelling.